7Nyman D J,Johnson E R,Roach C H.Trans-Alaska pipeline emergency response and recovery following the November 3,2002 Denali Fault Earthquake[C]//ASCE Technical Council on Lifeline Earthquake Engineering,Long Beach,CA,August 2003,and Publication in the Conference Proceedings,p1-11.
8Yokel F Y,Mathey R G.Earthquake resistant construction of gas and liquid fuel pipeline systems serving,or regulated by the Federal Government[R].Building and Fire Research Laboratory of National Institute of Standards and Technology.Prepared for Federal Emergency Management Agency.March,1992,pp11-14.
9Nyman D J,Nelson E L,Roach C H.New trans-Alaska pipeline earthquake monitoring system[C]//Conference Proceeding Paper Part of:Optimizing post-earthquake lifeline system reliability,ASME,Jun 15,1999:897-906.
10Shimizu Y,Yasuda S,et al.Development of real-time safety control system for urban gas supply network[J].Journal of Geotechnical and Geoenvironmental Engineering,2007,133(2):237-249.