摘要
A new solution of combination network of GPS and high precise distance measurements with EDM is proposed. Meanwhile, it’s inadvisable only using GPS network without distance measurements. Three schemes: terrestrial network, GPS network and combination network are discussed for horizontal control network design of Xiangjiaba Dam in view of precision, reliability, coordinate and outlay in detail.
A new solution of combination network of GPS and high precise distance measurements with EDM is proposed, Meanwhile, it's inadvisable only using GPS network without distance measurements. Three schemes: terrestrial network, GPS network and combination network are discussed for horizontal control network design of Xiangjiaba Dam in view of precision, reliability, coordinate and outlay in detail.
基金
Supported bythe National 973 Programof China(No.2003CB716705)
International Cooperative Fund of European Union(No.EVGI-CT-2002-00061) .
关键词
大地测量学
工程测量
GPS
全球定位系统
可靠性
水电站
large-scale hydropower project
terrestrial network
GPS network
combination network of GPS and high precise distance measurements with EDM