摘要
根据经水泥搅拌桩加固软土地基后的路基沉降观测数据,选取两段不同加固深度的路基,从地基固结深度、路基加载速率等方面进行了分析,确定了路基施工的最佳时间,为同类工程施工提供了经验。
Accordir, g to the observation data of the roadbed sedimentation "after the enforcement of the soft soil ground with the cement mixing pile, this paper determines the optimum time of roadbed construction by selecting two roadbeds with different enforcement depths and analyzing on the ground consolidation depth, roadbed loading velocity and so on for providing the experiment for the similar construction engineering.
出处
《科技情报开发与经济》
2006年第24期191-192,共2页
Sci-Tech Information Development & Economy
关键词
水泥搅拌桩
软土地基
沉降速率
加载速率
cement mixing pile
soft ground
sedimentation velocity
loading velocity