摘要
随着铁路建设步伐的加快,铁路建设过程中引起的水土流失问题日益受到重视,以包兰线包头至惠农段电气化改造工程为研究对象,分析了沿线水土流失形式,确定了流失量,并对预测结果进行了总结。
With the speeding step of railway construction, soil and water loss caused by railway construction is arousing increasing concerns. Taking electrification of Baolan Railway in the section from Baotou to Huinong as the research object, the form of soil and water loss is analyzed, the quantity is calculated, and the forecast resuits are summarized.
出处
《石家庄铁道学院学报》
2006年第4期74-76,共3页
Journal of Shijiazhuang Railway Institute
关键词
铁路建设
水土流失
预测方法
railway construction
soil and water loss