摘要 结合怀柔区迎宾南路与京承线相交处的旧桥改造,介绍采用切割法切割既有U形铁路混凝土桥、D24军便梁加固既有铁路以及桥体顶进施工的工艺,为类似的工程提供一定的借鉴。 With the transformation of the old bridge at the crossroads of the Yingbinnan Road and the Beijing Chengde Railway in Huairou District as a practical example, the cutting method adopted for cutting the existing U-type railway concrete bridge, the method of strengthening the existing railway with D-24 military convenient girders, and the construction process for jacking in the new bridge body are presented in the paper. This construction process may serve as a reference for similar projects in future.
作者 古兰玉
出处 《国防交通工程与技术》 2006年第4期54-57,共4页 Traffic Engineering and Technology for National Defence
关键词 旧桥拆除 军便梁加固 框架桥顶进 demolition of old bridges strengthening with military convenient girders jacking-in a new reinforced concrete frame bridge
  • 相关文献

参考文献2

二级参考文献1

共引文献8

同被引文献4

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部