1[1]Nazanin Mossahebi,Aaron Yakel,Atorod Azizinamini.Experimental investigation of a bridge girder made of steel tube filled with concrete[J].Journal of Constructional Steel Research,2005,(61):371-386.
2[2]A Elremaily,A Azizinamini.A behavior and strength of concrete-filled tube columns[J].Journal of Constructional Steel Research,2002,(58):1 567-1 591.
3[3]A Elremaily,A Azizinamini.Experimental behavior of steel beam to CFT column connections[J].Journal of Constructional Steel Research,2001,(57):1 099-1 119.
7KANG J Y,CHOI E S,CHIN W J,et al. Flexural be- havior of concrete-filled steel tube members and its application[J]. International Journal of Steel Struc- tures,2007,7(4) :319-324.
8NAKAMURA S, TANAKA H, KATO K. Static a- nalysis of cable-stayed bridge with CFT arch ribs[J]. Journal of Constructional Steel Research, 2009, 65 (4) :776-783.
9MA Y S, WANG Y F, MAO Z K. Creep effects on dynamic behavior of concrete filled steel tube arch bridge[J]. Structural Engineering and Mechanics, 2011,37(3) :321-330.
10NAKAMURA S, MOMIYAMA Y, HOSAKA T, et al. New technologies of steel/concrete composite bridges[J~. Journal of Constructional Steel Research, 2002,58(1) : 99-130.