摘要
研究了渠道梯级电站群的运行特点,在分析基础上建立了这类电站群化高度的分解协调模型,并采用模拟和动态规划相结合的方法,求解了海南松涛灌区5级电站群的优化调度问题.且求解优化模型的基础上对渠道梯级电站群系统和站内运行提出了具体的调控规则.
A model of decomposition-coordination has been established based on the characteristic study of cascade hydropower sautions along a canal,and successfully solving the problem of optimum dispatch with 5 cascade hydropower stations located in Song Tao Irrigtion Project in Hat Nan province by combining dynamic programming with simulation techniques, thereafter some control principles are proposed both forstation operating and for system controlling.
出处
《水电能源科学》
北大核心
1996年第3期165-170,共6页
Water Resources and Power
关键词
梯级电站
优化调度
计算机模拟技术
cascade hydsopower stations,optimum dispatch,computer simulation techniques,decomposition coordination model,dynamic programming