基坑开挖引起工程桩偏斜后的补强设计与施工监控 被引量:7

REINFORCEMENT DESIGN AND CONSTRUCTION MONITORING OF DEFLECTED PILES CAUSED BY PIT EXCAVATION
下载PDF
导出
摘要 在某软弱地层上进行基坑开挖时,软土流动将坑内工程桩挤偏。为加固偏位群桩基础,保证桩基础安全、有效地承担上部结构荷载,采用锚杆静压桩并采取桩基逆作法对偏位群桩基础进行了补强,补桩过程中,实时观测基础沉降,以调整施工次序。 When excavation was being carried out in a soft foundation pit, the flows of soft soil squeezed away the engineering piles in the pit. In order to reinforce the deflected pile foundation and make it bear substructure load safely and effectively, statically-driven anchor piles by inverse construction were used to treat the destabilized pile foundation. Real-time monitoring of the foundation settlement was applied in the course of pile reinforcing construction ,so as to adjust the construction sequence timely,
出处 《建筑技术》 北大核心 2006年第12期913-915,共3页 Architecture Technology
关键词 桩基 偏位 锚杆静压桩 pile foundation pile deflection statically-driven anchor pile
  • 相关文献

参考文献7

二级参考文献16

共引文献62

同被引文献60

引证文献7

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部