污水截流井设计计算方法探讨 被引量:8

Discussion on Design Calculation Method of Sewage Intercepting Well
下载PDF
导出
摘要 结合《合流制系统污水截流井设计规程》(CECS 91:97)中的计算方法,通过某一算例,分析比较了在雨天实际截流工况下,堰式、槽式、槽堰结合式三种截流井的实际截流量相对于设计截流量的增加倍数,并提出了减小该增加倍数的相关措施。同时,针对堰式污水截流井提出了计算堰高的新思路,并与原设计方法进行了比较。 Based on the calculation methods in Specification for Design of Combined Sewage Intercepting Well (CECS 91 : 97), the paper discussed increase multiples of actual intercepting sewage flow relative to design intercepting sewage flow for three types wells of intercepting weir well, intercepting trough well, and intercepting weir-trough well under the conditions of rain days by a hypothesis case. And relative measures of reducing these values were put forward. Meanwhile, a new design calculation method about weir height of intercepting weir well was proposed, and calculation comparisons to the method in the design specification were made.
出处 《中国给水排水》 CAS CSCD 北大核心 2006年第24期41-44,共4页 China Water & Wastewater
关键词 污水截流井 截流量 截流管 堰高 sewage intercepting well intercepting sewage flow intercepting sewer weir height
  • 相关文献

参考文献1

二级参考文献3

共引文献4

同被引文献30

引证文献8

二级引证文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部