期刊文献+

RCM模型决策系统设计 被引量:8

Design of RCM model decision support system
下载PDF
导出
摘要 对RCM模型决策系统进行了需求分析,确定了进行模型辅助RCM决策所需的信息,数据处理方式以及如何利用模型辅助决策。所需的信息包括故障信息、维修信息和费用信息等,数据处理主要是对原始故障及维修数据的统计分析,模型主要用于计算最佳工作间隔期和评估工作组合。设计了RCM模型决策系统框架结构及详细流程,改变了以前RCM分析的工作方式,实现了主客观相结合,加强了数据审核,为RCM分析质量提供了保证。提出了系统实现的关键技术,给出了可供参考的实现方法。 System requirements analysis ofRCM model decision support system is carried out. Requirements ofinformation input, methods of data processing and how to use model to make decision assistance is introduced. The requirements of information include failure, maintenance and cost information etc. The data processing is mainly for statistics of original failure and maintenance data. The model is mainly used to calculate best interval of tasks and assess the combination of tasks, The frame of RCM model decision support system is designed. The way of RCM analysis is changed within the frame, the subjective data and objective data is integrated and the data checking is reinforced. All of above can ensure the quality of RCM analysis. Key techniques of system realize are put forward and some references is obtained from the given practical methods.
作者 温亮 贾希胜
出处 《计算机工程与设计》 CSCD 北大核心 2006年第23期4537-4539,4571,共4页 Computer Engineering and Design
关键词 维修 决策支持系统 模型 系统设计 系统框架 maintenance decision support system model design of system system frame
  • 相关文献

参考文献8

  • 1Jia Xisheng.OR modelling within the RCM context[D].UK:The University of Salford,2001.
  • 2John Moubray.Reliability-centered maintenance[M].UK:Oxford,1997.
  • 3贾希胜,贾云献,温亮.以可靠性为中心的维修及其模型支持[J].军械工程学院学报,2004,16(1):15-18. 被引量:26
  • 4程中华,贾云献,刘利,贾希胜.基于C/S模式的RCM分析决策系统的设计与实现[J].计算机工程,2004,30(13):174-177. 被引量:8
  • 5张杰彬.RCM建模研究[D].石家庄:军械工程学院,2001.
  • 6GJB1378-92.装备预防性维修大纲的制定要求与方法[S].
  • 7Benjamin S Blanchard,Wolter J Fabrycky.System engineering and analysis(影印本)[M].Third Edition.北京:清华大学出版社,2002.
  • 8甘茂治 康建设 高崎.军用装备维修工程学[M].北京:国防工业出版社,1999..

二级参考文献11

  • 1贾希胜,程中华.以可靠性为中心的维修(RCM)发展动态[J].军械工程学院学报,2002,14(3):29-32. 被引量:66
  • 2鹿玲杰 陈冬芳 王征.基于多Server的C/S模式的研究与实现[J].计算机应用研究,2002,:33-37.
  • 3Jia Xisheng.OR modelling within the RCM context [D].UK:The University of Salford,2001.
  • 4Sherwin David J.A critical analysis of Reliability-centered maintenance as a management tool [C].Wollongong, Australia:4th international conference of maintenance societies,2000.
  • 5Aven,Dekker R.A useful framework for optimal replacement models [J].Reliability Engineering and System Safety,1997,58(1):61-67.
  • 6Jia Xisheng,Hao Jianping. The RCM Analysis for a Complex System [J].IMA Journal of Mathematics applied in Business and Industry,1995,6(1):135-144.
  • 7Jia Xisheng,Christer A H.A periodic testing model for a preparedness system with a defective state[J].IMA Journal of Management Mathematics,2002,13(2):39-49.
  • 8Jia Xisheng.Parameter Estimation of Delay Time Model for A Complex System[C].UK:Cambridge Young OR conference,2000.
  • 9Jia Xisheng,Christer A H.Delay Time Modelling for Complex System-A Case Study[C].UK:4th IMA International Conference,2001.
  • 10贾希胜,Chri.,AH.针对机械磨损过程的功能检测模型[J].中国机械工程,1998,9(12):34-37. 被引量:12

共引文献143

同被引文献79

引证文献8

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部