与世界最大直径盾构的亲密接触

Report on the tunnel project with the largest diameter in the world
下载PDF
导出
摘要 Shanghai Yangtze river tunnel is a part of the Shanghai Yangtze River Tunnel and Bridge project (Chong Ming Island River Crossing Project), which is intended to be completed within 5 years and will cost 12.6 billion RMB.It is constructed by the Shanghai Tunnel Engineering Corporation.The tunnel construction is marked with“ long, large, deep”, which starts from Pudong, meets at the circle line in the suburb and passes through Yangtze river’s south harbor region,with a total length of 8.9km. There are 2 shield machines applied in the tunnel excavation,which are manufactured by the Herrenknecht from Germany.The shield has a diameter of 15.43m, total length of 134m and weight of 3000t ,which is the largest diameter shield available for excavation projects by far, the length of one drive is 7.5km and is the longest distance currently in China. All of above attract us deeply,how is the project going on? Journalist went to the project site, reported on this project. Shanghai Yangtze river tunnel is a part of the Shanghai Yangtze River Tunnel and Bridge project (Chong Ming Island River Crossing Project), which is intended to be completed within 5 years and will cost 12.6 billion RMB.It is constructed by the Shanghai Tunnel Engineering Corporation.The tunnel construction is marked with“ long, large, deep”, which starts from Pudong, meets at the circle line in the suburb and passes through Yangtze river's south harbor region,with a total length of 8.9km. There are 2 shield machines applied in the tunnel excavation,which are manufactured by the Herrenknecht from Germany.The shield has a diameter of 15.43m, total length of 134m and weight of 3000t ,which is the largest diameter shield available for excavation projects by far, the length of one drive is 7.5km and is the longest distance currently in China. All of above attract us deeply,how is the project going on? Journalist went to the project site, reported on this project.
作者 刘慧彬
出处 《建筑机械》 北大核心 2006年第11S期36-38,共3页 Construction Machinery
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部