摘要
叙述了强夯法在冲填砂地基中的成功应用的全过程,从方案选择、设计参数、试夯方法、施工过程到检测结果不同阶段进行了分析论述,为类似工程提供参考。
The paper describes the whole process of successful application of dynamic compaction in filling sandy ground treatment analyzes and discusses in different stages from the selection of design option, design parameters, trial ramming process and construction process to testing result. It provides the reference for similar projects.
出处
《有色冶金设计与研究》
2006年第6期39-42,共4页
Nonferrous Metals Engineering & Research
关键词
强夯法
中填砂
夯沉量
夯击次数
dynamic compaction
filling sand
ramming volume
ramming times