摘要
本文综述了葛上直流工程极1系统调试期间发生的23次非正常停运的情况、发生原因及解决措施,并从中引出了有益的经验。
There were 23 abnormal shut downs occurred during the end to end system tests for pole 1 of the Ge-Shang HVDC project. The phenomena and the reasons of these events are descused in this paper. Improving measures taken during the tests and some valuable experiences gained from the tests are also described.