摘要
从力学角度分析了在高桩码头横梁和挡土墙之间增加隔震装置(一种新的防冲撞措施)的功能、结构以及安装等问题。
The function and structure as well as the installation of the vibration insulation unit (a new impact prevention measure) added between the beam of high.pile wharf and retaining wall are discussed from the view of mechanics in the paper.
出处
《港工技术》
1996年第1期37-39,共3页
Port Engineering Technology