摘要
介绍粉煤灰混凝土在北仑港建设中应用于钻孔灌注桩及其上部结构,对原材料的质量要求、配制、施工控制以及技术经济效益等。
In the paper,the application of powered coal ash concrete to the borehole cast.in place concrete pile and the upper structure in the construction of Beilun Port is introduced. The requirements for the quality of raw material,compound and construction control as well as the technical economic benefit are also introduce in it.
出处
《港工技术》
1996年第3期52-56,共5页
Port Engineering Technology
关键词
粉煤灰混凝土
配制
钻孔灌注桩
港口工程
powered coal ash, compound, quality, borehole cast-in-place concrete pile