摘要
介绍了北京东方雨虹防水技术股份有限公司承接的10项奥运工程的概况;针对部分工程论述了防水设计、施工、选材、配件等方面的具体问题,还对重要细部节点和特殊处理部位的创新及构造做法进行了详解。
There are 19 facilities under construction for 08 Olympic Games, Beijing, such as underground interchange, public transport junction, public and commercial buildings. Beijing Oriental Yuhong has taken part in 20 waterproofing works of the facilities since Oct. 2003, totaling construction area of 2 000 000 m^2.
出处
《中国建筑防水》
2006年第B12期106-116,共11页
China Building Waterproofing