港深西部通道后海湾大桥是一座全长460 m的单索面独塔斜拉桥,其上部结构为钢箱梁,分为22个节段。介绍整体提升技术在后海湾大桥钢梁架设中的应用。
The Hau Hoi Wan Bridge on Hongkong-Shenzhen Western Corridor is a single pylon, single cable plane cable-stayed bridge totaling 460 m in length and the superstructure of the Bridge is designed as a steel box girder structure composed of 22 girder blocks. In this paper, the application of heavy lifting technique to the erection of the girder blocks of the Bridge is described.
出处
《桥梁建设》
EI
CSCD
北大核心
2006年第6期51-53,72,共4页
Bridge Construction
关键词
斜拉桥
钢箱梁
整体提升
桥梁架设
cable-stayed bridge
steel box girder
heavy lifting
bridge erection