期刊文献+

轴流泵站经济运行方案的确定 被引量:6

Determination of economical operation program at draining pump station
下载PDF
导出
摘要 轴流泵站建成后,灌排区域内作物组成、水文、气象等因素将发生变化,引起泵站进出水池水位、泵站扬程和流量发生变化,致使泵站运行效率低,能源消耗高.为保证泵站在原有设备的条件下经济合理地运行,达到提高泵站效率,降低能源消耗,减少运行费用的目的,提供了根据泵站的提水流量、进出水池水位和泵站扬程的变化,通过调节轴流泵的叶片安装角度,来提高泵站效率和降低能源消耗的技术措施,给出了用系统分析的方法确定轴流泵经济运行方案的数学模型、约束条件和求解方法.通过多座泵站的应用,并经泵站测试,泵站效率已得到提高,取得了良好的效果.为泵站的经济运行提供了依据. After an axial-flow pump station is completed, the water levels of inlet and outlet sumps, head of pump station and capacity of pump station will all change with changes in the irrigation and drainage area, cropping pattern, hydrological and meteorology effects, resulting in low efficiency and high energy consumption. The keep the pump stastion running at economic condition a mathematical model and restraining condition based on system analysis and the solving methods are given for determining the economical operation alternative. By applying the model to reality, the efficiency of pump station is improved.
出处 《排灌机械》 2006年第6期20-23,共4页 Drainage and Irrigation Machinery
基金 江苏省教育厅泵站节能技术研究与推广项目(JHZD04-041) 江苏省建筑节能工程技术研究开发中心资助项目(ZX05-02)
关键词 轴流泵站 经济运行 数学模型 计算软件 axial-flow pump station economical operation mathematic model calculate software
  • 相关文献

参考文献6

二级参考文献19

共引文献44

同被引文献31

引证文献6

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部