国际工程调值结算中汇率影响的教训 被引量:3

Lesson of the exchange rate in value adjusting settlement of the international project
下载PDF
导出
摘要 国际工程遵循合同至上的原则,但由于认识和习惯的限制,虽然工程合同已经得到了国际工程承包企业的足够重视,但在具体落实过程中还存在许多问题,需要更为细致的研究。国际工程大多采用调值公式进行动态结算,具体的调值公式由甲乙双方在合同中约定。在某海外工程中,由于业主在公式中加入了汇率调整系数,但在谈判中未能引起承包商的高度重视,致使在工程结算中遭受了50万$的不必要的损失,教训深刻。 Contract is paramount to all the others in international engineering. But it has no acquaintance for Chinese construction corporation. In most cases, the dynamic settlements of international engineering projects are conducted by value adjusting formula which is specifically designated in the agreement by the concerning parties. In a certain overseas project, due to the fact that the employer added the exchange rate adjusting coefficient into the formula, which didn't draw contractor's enough attention during the contract negotiation, 500 000 $ unexpected loss was made in the project settlement. It is a serious lesson that should be drawn great attention.
作者 曹萍 曹双群
出处 《西安科技大学学报》 CAS 北大核心 2006年第4期473-475,489,共4页 Journal of Xi’an University of Science and Technology
关键词 合同管理 国际工程结算 调值公式 汇率调整系数 contract management international engineering project settlement value adjusting formula exchange rate adjusting coefficient
  • 相关文献

参考文献7

二级参考文献1

共引文献7

同被引文献16

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部