摘要
文章分析了正南淮堤深层搅拌桩截渗墙后汛期出现少量管涌的原因,并提出处理方法。
This paper analyzes the reasons for appearing a small amount piping behind the seepage- proof walls in Zhengnan Huai River Levee and proposes the treatment method.
出处
《安徽水利水电职业技术学院学报》
2006年第4期8-9,共2页
Journal of Anhui Technical College of Water Resources and Hydroelectric Power
关键词
深层搅拌桩
防渗墙
管涌
deep mixing stake, seepage- proof walls
piping