期刊文献+

特殊需求的大规模集中铁路运输的运行计划研究 被引量:6

The Research of Train Operation Plan of Aggregate Transport on the Special Requirement
下载PDF
导出
摘要 特殊需求的大规模集中铁路运输的运量大、时限要求紧,容易导致区域内运能紧张,并造成短时间内运输秩序紊乱和运输质量下降。本文提出制定列车运行计划的方法,对运输能力进行合理利用,统筹规划铁路运输生产,可以较好地解决该问题。在分析运行计划制定要求的基础上,建立特殊需求的大规模集中铁路运输运行模型。从特殊需求的自身规律出发,运用知识系统和案例推理相结合的方法选择运输径路,设计基于固定点号的运行计划安排算法,在选定的运输径路上安排运行计划。提出突发事件情况下的运行计划调整方法。依据该模型算法,开发出相应的软件。通过实例验证,制定的运行计划合理可行,还能针对突发事件进行调整,可为特殊需求的大规模集中铁路运输提供有效的决策支持。 The aggregate rail transport on the special requirement (ARTSR) has a great volume of traffic with a great urgency, which may easily cause the traffic tension of the area, the disruption of working in some periods and the decline of transport efficiency. The paper proposed a method of composing a train operation plan before transport, which can program traffic capacity overall and can make the transport working in order, so it may solve the problem well. By analyzing the requirement of composing a train operation plan, the paper designed a model of the ARTSR. The paper showed a way combining KBS (Knowledge Based System) and CBR(Case Based Ratiocination) to choose the transport routes, and proposed a programmed algorithm based on a method of the fixed train path by the regular characteristic of ARTSR, which could arrange the train schedule on the chosen transport routes. The paper gave an adjusting method to the emergency too. By the model and the algorithm of ARTSR, we had developed a software for it. The paper gave an example to verify the software, and the result showed that the composed train operation plan was reasonable and it could adjust flexibly due to the emergency, so it can give effectively decision support for ARTSR.
出处 《铁道学报》 EI CAS CSCD 北大核心 2006年第6期22-27,共6页 Journal of the China Railway Society
关键词 列车运行计划 大规模集中铁路运输 特殊需求 train operation plan aggregate rail transport special requirement
  • 相关文献

参考文献2

共引文献4

同被引文献29

  • 1石玉峰,门志强.基于模糊多目标决策理论的军事运输路径优化研究[J].交通运输工程与信息学报,2004,2(1):112-116. 被引量:21
  • 2武旭,胡思继,崔艳萍,马叶江.铁路运输与社会经济协调发展评价问题的研究[J].铁道学报,2005,27(3):20-25. 被引量:19
  • 3梁栋,林柏梁.铁路空车调配的多阶段策略优化模型研究[J].铁道学报,2007,29(1):1-6. 被引量:12
  • 4DUNN C E,NEWTON D.Optimal Routes in GIS and Emergency Planning Applications[J].Area,1992,24(3):259-267.
  • 5SINUANY-STERN Z,STERN E.Simulating the Evacuation of A Small City:the Effects of Traffic Factors[J].Socio-Economic Planning Sciences,1993,27(2):97-108.
  • 6CHURCH R L,SEXTON R M.Modeling Small Area Evacuation:Can Existing Transportation Infrastructure Impede Public Safety?[R].Santa Barbara:University of California,2002.
  • 7COVA T J,JOHNSON J P.Microsimulation of Neighborhood Evacuations in the Urban-Wild Land Interface[J].Environment and Planning A,2002,34(12):2211-2229.
  • 8HAND L,YUAN F.Evacuation Modeling and Operations Using Dynamic Traffic Assignment and Most Assignment and Most Desirable Destination Approaches[C]//TRB.The 84th Transportation Research Board AnnualMeeting.Washington:TRB,2005:964-969.
  • 9李引珍,何瑞春,郭耀煌.一类交通网络中相异最短路径模型及算法研究[C]//中国运筹学会第七届学术交流会论文集.香港:Globi-Link出版社,2004:684-690.
  • 10R Horst,P Mpardalos,N V Thoai.全局优化引论[M].黄红选,译.北京:清华大学出版社,2000:297-300.

引证文献6

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部