国电大同发电有限公司为了实现机组的节能降耗,提高企业的经济效益,对8号机组凝结水泵进行了变频改造。为此介绍热工方面改造的方案、改造后的运行情况及存在的问题。
To realize energy conservation and the reduction of energy comsumption,and got the good economic benefit of enterprises ,the condensing water pumps of the No. 8 Unit are transformed with veriable freguency drive technology in Guodian Datong Electric Power Generation Co. Ltd. This paper introduces the transformation plan of thermal control system ,and the condition of the operation after the transformation, and points out the problems in running after the transformation.
出处
《华北电力技术》
CAS
2006年第12期46-48,共3页
North China Electric Power
关键词
凝结水泵
变频控制
改造方案
运行情况
参数整定
condensing water pumps
veriable-frequency drive control
the plan of transformation
setting of parameters