摘要
对湘钢TRT自投产以来存在的问题进行了分析,采取了相应的技术措施,使TRT在较短的时间内达到正常运行状态,并尽可能多发电。
The problems in TRT of Xiangtan Iron & Steel Co. since commissioning were analyzed and the related measures were adopted. Therefore, TRT came to normal operation state in a short time and power could be generated more.
出处
《冶金动力》
2006年第6期21-22,共2页
Metallurgical Power
关键词
TRT
静叶
压力
流量
氮封
TRT
fixed blade
pressure
flow rate
nitrogen sealing