土卡河水电站泄洪消能设计 被引量:1

The Design of Flood Discharging and Energy Dissipation for the Tuka River Hydropower Project
下载PDF
导出
摘要 云南土卡河水电站是一个中型水电工程,拦河坝为碾压混凝土重力坝。在参考国内中型水电站的泄洪消能设计经验后,结合土卡河的洪水、地质条件、尾水条件及枢纽布置特点,在施工详图阶段,对枢纽的泄洪消能方式进行了优化,采取了台阶式溢流坝面加平尾墩及戽式消力池方案,水工模型试验表明该方案是合理的。 The Tuka hydropewer project is a medium - sized hydropewer development with a miler compacted concrete gravity dam in Yunnan province, China. Taking into consideration the flood, geological and tailrace conditions, as well as the layout of the project, the way of flood discharging and energy dissipation of the project complex was optimized at the construction details design stage by reference to the flood discharging and energy dissipation design experience of other medium - sized hydmpower projects of its kind at home. The hydraulic model test indicates that the adoption of a stepped spillway face with flat baffle piers and a bucket basin has proved reasonable.
出处 《云南水力发电》 2006年第6期33-34,37,共3页 Yunnan Water Power
关键词 碾压混凝土重力坝 台阶式溢流坝面 泄洪 消能 miler compacted concrete gravity dam stepped spillway face flood discharging energy dissipation
  • 相关文献

同被引文献9

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部