回龙抽水蓄能工程是河南省第1个抽水蓄能电站,安装2×60MW单级可逆式水泵水轮机。工程在安装和调试过程中发生了许多施工单位以前未遇到的问题。施工过程中的管理与以前相比有不同程度的突破。文章总结了工程中出现的问题并给出解决的办法,可供类似工程借鉴。
Huilong Pumped-storage Power Station is the first pumped-storage power station in Henan province, which is installed with 2x60 MW single-stage reversible water pump hydraulic turbines. During installation and commissioning many problems occurred, which construction companies never faced to. Its construction management was also different from the traditional construction in many aspects. The summary of the previous problems and their solution will be reference for the similar projects in future.