关于对火铺矿选煤厂350万t/a扩能改造的初步构想

Preliminary Plan of 350万t/a Capacity Enlarging Reconstruction for the Coal Washery of Huoshaopu Mine
下载PDF
导出
摘要 介绍火铺矿选煤厂的现状及存在的瓶颈制约问题,与配套矿井进行同步扩能改造的必要性和紧迫性;根据矿井采煤方法及煤质特性并结合选煤厂现有工艺等实际情况,提出了选煤厂扩能改造的初步构想:即采用原煤预排矿———三产品全煤重介———煤泥直接浮选———尾煤泥压滤联合工艺流程,并对该工艺流程进行了详细阐述,提出了本次技改存在问题。 The present situation and the existing bottleneck problem of coal washery of Hueshaopu Mine and the necessity and urgent need for synchronous capacity enlarging reconstruction of the washery plant and the mine are introduced. Based on the mining method, coal properties and the present process of the coal washery, a preliminary plan of capacity enlarging reconstruction for the washery plant is proposed, that is a combined process: pre-separation of gangue from coal, all coal separating by three products heavy medium cyclone, fine coal flotation and pressure filtration of fine coal railings. The process flow is described in detail, and the problems in the technique reconstruction are indicated.
作者 姚仁山
出处 《云南冶金》 2006年第6期24-26,共3页 Yunnan Metallurgy
关键词 扩能改造 产品概况 工艺概况 工程项目 capacity enlarging reconstruction product structure process summary engineering project
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部