全过程造价管理月报制度的探讨 被引量:3

Study on the Monthly Report System of Whole Process Cost Management
原文传递
导出
摘要 通过紧密结合我国目前推行的全过程造价管理理论,以建设项目设计阶段和施工阶段为重点,从项目基本情况、现场情况、全过程造价管理、全要素造价管理、全风险造价管理、全团队造价管理、后阶段工作重点、工程图片共八个方面阐述了全过程造价管理月报的要领和内容,并深入分析了全过程造价管理月报的性质、作用以及对月报的运用。 The text introduces the essentials and contents of monthly report system of whole process cost management through the following eight aspects: basic information of project, field situation, whole process cost management, whole elements cost management, whole risks cost management, whole teams cost management, key emphasis of work in later sections, picture of project. The text combines with the whole process cost management theories that implement in our country now, mainly presents the design process and work process, and gives a further instruction of complex, functions and uses of monthly report of whole process cost management.
作者 张晓平
出处 《建筑经济》 北大核心 2006年第12期40-42,共3页 Construction Economy
关键词 全过程造价管理 月报 制度 whole process cost management monthly report system
  • 相关文献

参考文献2

  • 1北京市建设工程造价管理处.北京市建设项目全过程造价管理操作指南(草稿)[D].2006.
  • 2湖北省建设工程造价咨询协会.湖北省建设工程项目全过程造价管理导则(试行)[D].2006.

同被引文献2

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部