期刊文献+

工程量清单计价模式下企业定额的编制思路 被引量:12

The Thought of Compiling Corporation Quota under the Mode of Bill with Quantities Evaluating
原文传递
导出
摘要 论述了工程量清单计价模式下企业定额在投标报价中的重要作用以及我国建筑施工企业应用企业定额的现状及弊病,提出了企业定额的编制思路。指出:在工程量清单计价模式下,建筑施工企业需要在投标报价工作实践和管理水平、技术水平不断提高的过程中,迅速完成企业定额的编制工作。使企业定额简明适用、切合实际、科学合理,保证建筑施工企业科学管理现代化,投标报价合理化。 This paper analyzes corporation quota's function in bidding under the mode of bill with quantities evaluating as well as the current situation and abuse in application of corporation quota. It also puts forward the thought of compiling corporation quota. Under the mode of bill with quantities, construction enterprises should finish corporation quota's compilation rapidly in the working practice of bidding and in the process of improvement of manage- ment level and engineering level. This job aims to make corporation quota concise, applicable, scientific and rational and guarantee the modernization of scientific management and the rationalization of bidding.
出处 《建筑经济》 北大核心 2006年第12期43-46,共4页 Construction Economy
关键词 工程量清单计价 企业定额 平均先进水平 the bill of quantities evaluating corporation quota average advanced level
  • 相关文献

参考文献2

共引文献2

同被引文献51

引证文献12

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部