摘要
通过资料搜集、整理、野外地质调查、现场地温观测、现场物探检测、室内岩石物理力学试验等多种手段,对坝址区地热异常现象进行较详细地分析,同时分析在较高地温条件下可能带来的工程地质问题,并提出了相应的工程处理措施建议。旨在总结出了一套地热异常研究的方法,供其他水电站遇类似问题时借鉴。
By means of data collection, sorting, field geological survey, observation of site ground temperature, site geological prospecting and indoor rock physical mechanics test, the geothermal anomaly at damsite was carefully analyzed, and simultaneously it may give rise to engineering geological problems under higher ground temperature, and put forward relevant treatment measures so as to sum up research methods on geothermal anomaly used for reference of similar hydropower projects.
出处
《西北水电》
2006年第4期18-22,30,共6页
Northwest Hydropower
关键词
地热异常
地温观测
分布规律
处理措施
geothermal anomaly
ground temperature observation
distribution regularity
treatment measure