兰州南山伏龙坪双层隧道施工方案比选与研究 被引量:1

Comparison and Study of Construction Methods Of Fu Longping Double-decked Tunnel In Nanshan of Lanzhou
下载PDF
导出
摘要 采用二维弹塑性有限元法,分析了在两种施工方案下伏龙坪双层隧道各个施工阶段围岩和衬砌的受力状态,考虑材料的非线性特征,采用Mohr-Coulomb屈服准则及其关联流动法则,采用切线刚度迭代法求解平衡方程,对超过屈服点的应力进行应力调整. This paper analyzes the forced state of surrounding rock and tunnel lining in every step of the construction project for Fu longping double - decked tunnel. In the analysis, considering the elastic - plastic characteristic of the material, Mohr- Coulomb's yield criterion is employed in coporating associated flow law . The tangent stiffness method is adopted to solve the equation of equilibrium, and the stresses which exceeded yielded point are adjusted.
出处 《兰州工业高等专科学校学报》 2006年第4期40-42,共3页 Journal of Lanzhou Higher Polytechnical College
关键词 有限元分析 双层隧道 二维弹塑性 finite element analysis double - decked tunnel 2D elasic - plastic
  • 相关文献

参考文献3

  • 1EmilioLópezBaillón,马琪.单管隧道内的双层地铁[J].城市轨道交通研究,2003,6(5):86-87. 被引量:17
  • 2王德毓,李家城.复兴东路南线“破门”而出双层隧道施工展开[N].东方网-劳动报,2003—04—26(1).
  • 3潘昌实,张弥,吴鸿庆.隧道力学数值方法[M].北京:中国铁道出版社,1994.

共引文献19

同被引文献11

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部