某建筑物开裂原因分析及复合桩基的设计实践 被引量:1

The Cause of A Building Cracking and The Design Practice of Composite Pile Foundation
下载PDF
导出
摘要 某建筑物在主体结构完工时,发现部分框架梁上有裂缝,而且差异沉降及沉降速率较大,远未达到规范规定的稳定标准。本工程应用复合桩基的设计方法,采用锚杆静压桩进行加固处理,达到了控制沉降变形的目的。工程实践表明该方法具有较好的技术与经济效益。 When the main body structure of a building had been finished, it was found that there were cracks in a part of frame girders, and there were great uneven settlement and the settlement speed that didn't meet the requirment. The project applied the design method of composite pile foundations, using static pressure piles with anchor pole to reinforce the foundation, and the purpose of controlling settlement distortion is obtained. The practice of project proved that the method could brlngbetter technologic and economic benefit.
作者 马郧 刘佑祥
出处 《土工基础》 2006年第6期6-8,共3页 Soil Engineering and Foundation
关键词 裂缝 差异沉降 复合桩基 静压桩 crack, uneven settlement, composite pile foundation, static pressure pile
  • 相关文献

参考文献1

  • 1《既有建筑地基基础加固技术规范》(JGJ123—2000)[S].北京,中国建筑工业出版社

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部