摘要
由于引江济汉工程区域内河流缺乏径流资料,采用暴雨资料来计算设计洪水。经合理性论证后认为,设计暴雨与设计洪水成果合理可靠,满足本阶段引江济汉干渠设计需要。
As it is deficient in runoff data in region of Yangtze River to Hanjiang River Water Diversion Project, so the regional design flood is calculated in accordance with rainstorm data in this area, the reliability of calculated result of design rainstorm and design flood is demonstrated by reasonalbility analysis and is affirmable to meet the design specification of main diversion canal in present stage.
出处
《湖北水力发电》
2006年第4期14-16,共3页
Hubei Water Power
关键词
引江济汉
设计洪水
综合单位线
交叉河流
拾桥河
design flood, synthetic unit hydrography, cross river, Shiqiao River, Yangtze River to Hanjiang River Water Diversion Project