期刊文献+

张河湾抽水蓄能电站上水库施工测量技术 被引量:1

Construction Survey Technology for Upper Reservoir of Zhanghewan Pumped Storage Power Station
下载PDF
导出
摘要 根据工程实践,提出了用全站仪直接测量平距、高差来代替测斜距、天顶距作四等及四等以下控制网测量的理论依据和方法,并以张河湾抽水蓄能电站施工控制网为例进行了比较计算.讨论了多线型、多曲面复杂形体的施工放样和计量方法. According to the engineering practice, the theoretical basis and method that survey directly the horizontal distance and height difference by the total station system as fourth grade and below fourth grade control network are put forward instead of surveying slant distance and zenith distance. Taking the control network of Zhanghewan Pumped Storage Power Station for example, the comparative calculation is made; and the construction setting-out and measurement method for the complex form and structure with multi-line type and multi-curved surface is discussed.
出处 《三峡大学学报(自然科学版)》 CAS 2006年第6期492-495,共4页 Journal of China Three Gorges University:Natural Sciences
关键词 抽水蓄能电站 控制测量 施工放样 工程计量 pumped storage power station control survey construction setting-out engineering measurement
  • 相关文献

参考文献1

  • 1彭荷生,荣燮阳.水电水利工程施工测量规范(DL/T5173-2003)[S].北京:中国电力出版社,2003:54-55,121-131.

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部