基于Agent的生产调度混合协商策略研究 被引量:4

Hybrid negotiation mechanism for Agent-based production scheduling
下载PDF
导出
摘要 当前大多协商策略无法兼顾规划和反应能力,为此,本文提出一种短期规划与动态响应能力相结合的混合协商策略。该策略针对柔性车间生产调度问题和面对扰动的再调度问题,将组合拍卖与改进合同网相结合,通过规定相关智能体的动作和交互顺序,实现系统在平稳或扰动状态下的生产调度。基于上述协商策略,开发了一个基于智能体的生产调度原型系统,并通过仿真实验验证协商策略的可行性和有效性。 In Agent--based production scheduling, Agents scheduling were completed through proprietary strategy and negotiation mechanism. The negotiation mechanism specified the concrete negotiation methods. Most existing negotiation strategies were unable to balance planning and response. To deal with this problem, a novel hybrid negotiation mechanism was presented which combined short-term planning with dynamic response. The proposed strategy was designed to cope with flexible Job-shop scheduling and disturbance-oriented rescheduling. Combining combinatorial auction with modified contract net, the production scheduling in stable or disturb state was realized through defining actions and interaction sequences of relevant Agents. Then, a prototype system was developed based on Java Agent DEvelopment framework(JADE) platform and the simulation tests were given to demonstrate the feasibility and effectiveness of the mechanism.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2006年第12期2074-2081,共8页 Computer Integrated Manufacturing Systems
基金 国家重点基础研究规划资助项目(2002CB312204-03) 国家自然科学基金重点资助项目(70431003)~~
关键词 生产调度 多智能体系统 协商策略 敏捷调度 组合拍卖 production scheduling multi--Agent system negotiation mechanism agile scheduling combinatorial auction
  • 相关文献

参考文献15

  • 1RABELO R J,CAMARINHA-MATOS L M,AFSARMANESH H.Multi-Agent-based agile scheduling[J].Robotic and Autonomous System,1999,27(1-2):15-28.
  • 2WANG Y H,YIN C W,ZHANG Y.A multi-Agent and distributed ruler based approach to production scheduling of agile manufacturing systems[J].International Journal Computerlntegrated Manufacturing,2003,16(2):81-92.
  • 3王艳红,尹朝万.一类基于多Agent和分布式规则的敏捷生产调度[J].控制理论与应用,2004,21(4):526-530. 被引量:8
  • 4SHEN W.Distributed manufacturing scheduling using intelligent Agents[J].IEEE Intelligent Systems,2002,17(1):88-94.
  • 5KUTANOGLU E,WU S D.On combinatorial auction and Lagrangean relaxation for distributed resource scheduling[J].IIE Transactions,1999,31(9):813 -826.
  • 6DEWAN P,JOSH S.Auction-based distributed scheduling in a dynamic Job-shop environment[J].International Journal of Production Research,2002,40(5):1173-1191.
  • 7SMITH R G.The contract net mechanism:high-level communication and control in a distributed problem solver[J].IEEE Transactions on Computers,1980,29 (12):1104 -1113.
  • 8FORDVEE K,SULLIVAN G G.Logistics management system (LMS):integrating decision technologies for dispatch scheduling in semiconductor manufacturing[M].San Francisco,Cal,USA:Morgan Kaufmann,1994.473-516.
  • 9Te.S.C.He.T.Project.Java Agent development framework is an open source platform for peer-to-peer Agent based applications[EB/OL].http://jade.cselt.it/,2004-08-26.
  • 10LV C X,ZHU Y L,YIN C W.Resource allocation based on combinatorial auction in e-manufacturing environment[A].Proceedings of the 5th International Conference on Computer and Information Technology (CIT 2005)[C].Los Alamitos,Cal,USA:IEEE Computer Society,2005.983-989.

二级参考文献8

  • 1蒋新松,张申生.敏捷竞争的挑战与思考[J].计算机集成制造系统-CIMS,1996,2(1):3-9. 被引量:73
  • 2RABELO R J,CAMARINHA-MATOS L M,AFSARMANESH H.Multi-agent-based agile scheduling[J].Robotic and Autonomous System,1999,27(1-2):15-28.
  • 3MATURANA F P,NORRIE D H.Multi-agent mediator architecture for distributed manufacturing[J].J of Intelligent Manufacturing,1996,7(4):257-270.
  • 4SHEN W,XUE D,NORRIE D H.An agent-based manufacturing enterprise infrastructure for distributed integrated intelligent manufacturing systems[C]∥Proc of the Third Int Conf on the Practical Application of Intelligent Agents and Multi-Agents.London,UK:[s.n.],1998:533-548.
  • 5SMITH R.The contract net protocol: high level communication and control in a distributed problem solver[J].IEEE Trans on Computers,1980,29(12):1104-1113.
  • 6McDONNELL P,SMITH G,JOSHI S,et al.A cascading auction protocol as a framework for intelligent process planning and heterarchical shop floor control[J].Int J of Flexible Manufacturing Systems,1999,11(1):37-62.
  • 7JAYAMOHAN M S,RAJENDRAN C.New dispatching rules for shop scheduling: a step forward[J].Int J of Production Research,2000,38(3):563-586.
  • 8王艳红,尹朝万,张宇.基于多代理和规则调度的敏捷调度系统研究[J].计算机集成制造系统-CIMS,2000,6(4):45-49. 被引量:19

共引文献7

同被引文献61

引证文献4

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部