期刊文献+

基于网络化组织的并行工程管理研究 被引量:4

A study on concurrent engineering management based on network organization
下载PDF
导出
摘要 传统直线职能式组织结构已不适应并行工程跨部门并行的特点,寻求适合并行工程的更加灵活的组织结构成为保证并行工程顺利实施的关键,因而网络化组织结构以其灵活性和支持跨部门协作的特点被关注。基于网络化组织的特点分析,对在网络化组织平台上实施并行工程的项目管理、协同管理和远程监控管理进行了有益的探讨。 The structure of traditional organization couldn't adapt the needs of concurrent engineering. Seeking more flexible organization structure becomes the key problem of the successful implementation of concurrent engineering. Network organization has been paying more attention by its flexibility and adaptability to cooperation of different functional department. Explores the project management, cooperation management and long-distance monitoring management of implementing concurrent engineering on network organization platform based on characteristic analysis of network organization.
作者 张利 卢岚
出处 《现代制造工程》 CSCD 2006年第12期23-25,70,共4页 Modern Manufacturing Engineering
关键词 并行工程 网络组织 协同管理 远程监控 Concurrent engineering Network organization Cooperation management Long-distance monitoring
  • 相关文献

参考文献6

二级参考文献18

  • 1常天庆,李敬逸,徐文胜,熊光楞.Consistent Algorithm for Multi-value Constraint with Continuous Variables[J].Tsinghua Science and Technology,1999,4(2):20-24. 被引量:1
  • 2张天顺,欧阳厚森,杨林楠.基于Web的PDM系统及其虚拟企业建模[J].制造技术与机床,2004(9):63-67. 被引量:1
  • 3刘敏,曲健,陆国胜.并行工程的应用技术研究[J].现代制造工程,2005(6):121-123. 被引量:2
  • 4[1]Xiong Guangleng, Chang Tianqing. Coordination Model for the Concurent Engineering Product Development Process [J]. High Technology Letters, 1998, 4(2): 1-8.
  • 5[2]Allen J F. Maintaining knowledge about temporal intervals [J]. Communicationof ACM, 1983, 26: 832-843.
  • 6[3]Vilain M, Kautz H. Constraint propagation algorithms for temporal reasoning[A]. In: Proceedings of AAAI-86 [C]. 1986, 377-382.
  • 7[4]Vilain M. A system for reasoning about time [A]. In: Proceedings of AAAI-82[C]. 1982, 197-201.
  • 8[5]Meiri I. Combining qualitative and quantitative constraints in temporal reasoning [J]. Artificial Intelligence, 1996, 87: 343-385.
  • 9[6]Dechter R, Meiri I, Pearl J. Temporal constraint networks [J]. Artificial Intelligence, 1991, 49: 61-95.
  • 10[7]Belhe U, Kusiak A. Modeling relationships among design activities [J]. Journal of Mechanical Design, 1996, 118(12): 454-460.

共引文献22

同被引文献26

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部