国际工程承包风险预警系统的构建 被引量:3

The construction of early warning system of international engineering contract
下载PDF
导出
摘要 国际工程承包风险预警系统包含风险识别分析、风险预警和风险规避对策3个模块.风险识别模块是系统地对风险相关事件进行挖掘与分类的过程.风险预警模块的主要任务是确定风险预警的指标体系,并运用数学方法建立综合评价模型,测算出国际工程承包项目的风险程度.风险对策模块针对发出预警信号的风险因素分析其性质,寻找应对的方法,使承包商尽量规避风险,减少甚至不遭受损失. The early warning system of international engineering contract are risk identification & analysis module, early warning module and risk countermeasure module. Risk identification & analysis module is a process carrying on systematical risk mining and categorizing. The main mission of the risk early - warning module is to design a risk early -waming index system, compare the score of a certain risk index with the ear- ly - warning scope, and send out an early waming signal if the risk factor outruns the early - warning scope. Moreover, a comprehensive evaluation model is set up to measure the comprehensive function of those various risks to the international engineering contract, and get the risk degree of it. The risk countermeasure module analyzes the risk factors that send out early -warning signal, and look for countermeasures to make the contractor evade risks as far as possible, reduce and even do not suffer loss.
作者 肖利民
出处 《哈尔滨工业大学学报》 EI CAS CSCD 北大核心 2006年第12期2129-2131,共3页 Journal of Harbin Institute of Technology
关键词 国际工程承包 风险识别 风险预警 风险对策 international engineering contract risk identification risk early warning risk countermeasure
  • 相关文献

参考文献8

  • 1JAAFARI A.Management of risks,uncertainties and opportunities on projects:time for a fundamental shift[J].International journal of project management,2001,19(2):89-101.
  • 2HE Zhi.Risk management for overseas construction projects[J].International Journal of Project Management,1995,13(4):231-237.
  • 3HLLY She,PED Love.ANN -Based Make-up Estimation System with Self-explanatory Capacities[J].Journal of Construction Engineering and Management,1999,125(3):185-191.
  • 4HANS H,DIEKMANN J E.Approaches for making risk -based go/no-go decision for international projects[J].Journal of construction engineering and management,2001,127(4):300-308.
  • 5ASHOT N,MITRA A.Neural Networks and Early Warning Indicators of Currency Crisis[J].Reserve Bank of India Occasional Papers,1999,20 (2):183-222.
  • 6SIMISTER S J.Usage and benefits of project risk analysis and management[J].Journal of Project Management,1994,12(1):5-8.
  • 7王秋萍,张道宏,李萍.主成分分析法与层次分析法排序公式的研究[J].西安理工大学学报,2005,21(4):437-440. 被引量:10
  • 8LUCY N.Integrated risk management[J].The Canadian Business Review,2002,23:26-28.

二级参考文献6

  • 1Saaty T L. The analytic hierarchy process[M]. McGraw-Hill International Book Company,1980.
  • 2高惠旋(GaoHui-xuan).应用多元统计分析(Applied multivariate statistical analysis)[M].北京:北京大学出版社(Beijing:Beijing University Press),2005..
  • 3Kendall M. Multivariate analysis[M]. Charles Griffin & Company Limited,1975.
  • 4Miller G A. The magical number seven plus or minus two:Some limits on our capacity for processing information[J].Psychological Review, 1956,63: 81-97.
  • 5Saaty T L,Hu G. Ranking by eigenvector versus other methods in the analytic hierarchy process[J]. Appl Math Lett,1998,11 (4): 121-125.
  • 6王秋萍.模糊综合评判与AHP的联系[J].西安理工大学学报,1997,13(4):385-388. 被引量:2

共引文献9

同被引文献12

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部