摘要 那兰水电站面板堆石坝为我国第一座将趾板置于河床覆盖层上的百米级高坝,坝体筑坝材料大部分采用砂砾料。设计中针对覆盖层及筑坝砂砾料的工程性质进行了深入研究,对趾板与地基的连接形式进行了多方案比较论证,解决了覆盖层上建面板坝的关键技术,并经实践检验,效果良好。 Dam of Nalan Hydropower Station is the first concrete face gravelfill and rockfill dam which is to exceed 100m in height and on deep alluvium in China, of which dam body is built with the badness gradation crude gravel and sand. In designing, it has put up deep researches on engineering character of alluvium and gravelfill material, and has also compared and demonstrated many schemes about junction form between plinth with foundation, which has advanced the key to solve the sixty-four-dollar question about CFRD on deep alluvium. It proves that the effect is good, based on practical work.
出处 《水力发电》 北大核心 2006年第11期45-47,共3页 Water Power
关键词 坝设计 面板堆石坝 趾板 覆盖层 砂砾料 那兰水电站 dam design concrete face rockfill dam plinth alluvium gravefill Nalan Hydropower Station
  • 相关文献

同被引文献77

引证文献11

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部