摘要
通过对芹山混凝土面板堆石坝、周宁碾压混凝土重力坝多年的运行监测和对两个大坝取得的监测成果进行的初步整理、分析,并与类似工程进行对比,该两个大坝渗漏水量较小,大坝工作性态正常,能满足安全运行的要求。监测成果也为该大坝的安全运行提供了有力保障。
Based on the results of studies made on the operation and instrumentation of the Qinshan concrete face rockfill dam and the Zhouning RCC gravity dam for years, and of comparison with similar projects, these two dams are found to be operating in normal condition with limited leakage and meeting the safety requirement. The results of monitoring have served as a guarantee for safety operation of the dams.
出处
《水力发电》
北大核心
2006年第12期85-86,89,共3页
Water Power
关键词
混凝土面板堆石坝
碾压混凝土重力坝
大坝监测
芹山水电站
周宁水电站
concrete face rockfill dam
RCC gravity dam
dam instrumentation
Qinshan Hydropower Station
Zhouning Hydropower Station