期刊文献+

临海强风化岩裂隙水的疏排方法

Dredge and discharge of strong alluvial mantle rock fissured water on the sea
下载PDF
导出
摘要 青岛现代艺术中心工程底板垫层施工完毕后,垫层出现比较复杂的渗水现象,结合工程临海地下岩石间隙水的特点,对此种不利条件下地下水的疏排进行了探讨.通过设置集水坑(井)和有条件加设盲沟的降、排水方法,有效地解决了此种情况下的降、排水施工的问题,结果表明该措施施工方便,经济可行. As the soleplate bed course construction has been finished in Modern Art Center project, water seepage in bed course and the situation becomes very complicated. This paper combines the characteristics of rock fissured water, discusses and researches the dredge and discharge of underwater under this situation. By installing catch basin(collector well), adding French drain for water draining, such construction problems as unfavorable geology condition drop, drain off water, have effectively been solved in construction practice.
出处 《青岛理工大学学报》 CAS 2006年第6期111-114,共4页 Journal of Qingdao University of Technology
关键词 明沟 盲沟 集水坑(井) 岩石间隙水 open drain, French drain, catch basin (collector well), rock interstitial water
  • 相关文献

参考文献5

二级参考文献7

共引文献89

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部