摘要
拟建场地地势相对较高,地貌单元隶属太湖冲积平原虞西高亢平原亚区,主要为第四系河流相冲积。介绍在拟建的建筑物超深基坑支护中,将多种支护方法进行组合,以达到理想的效果。
The relief of the construction site is high, and landform unit, belongs to Taihu Lake plain, is river facies sediment of Quaternary system. A combination of timbering methods used in the planned construction site was presented in the text. It is concluded that the comprehensive methods was of spreading significance.
出处
《江苏地质》
2006年第4期283-286,共4页
Jiangsu Geology
关键词
超深基坑
设计
施工
支护结构
江苏常熟
Ultradeep foundation pit
Design
Construction
Timbering structure
Changshu,Jiangsu