ANALYSIS AND IMPROVEMENT OF LEAD TIME FOR JOB SHOP UNDER MIXED PRODUCTION SYSTEM 被引量:1

ANALYSIS AND IMPROVEMENT OF LEAD TIME FOR JOB SHOP UNDER MIXED PRODUCTION SYSTEM
下载PDF
导出
摘要 Firstly an overview of the potential impact on work-in-process (WIP) and lead time is provided when transfer lot sizes are undifferentiated from processing lot sizes. Simple performance examples are compared to those from a shop with one-piece transfer lots. Next, a mathematical programming model for minimizing lead time in the mixed-model job shop is presented, in which one-piece transfer lots are used. Key factors affecting lead time are found by analyzing the sum of the longest setup time of individual items among the shared processes (SLST) and the longest processing time of individual items among processes (LPT). And lead time can be minimized by cutting down the SLST and LPT. Reduction of the SLST is described as a traveling salesman problem (TSP), and the minimum of the SLST is solved through job shop scheduling. Removing the bottleneck and leveling the production line optimize the LPT. If the number of items produced is small, the routings are relatively short, and items and facilities are changed infrequently, the optimal schedule will remain valid. Finally a brief example serves to illustrate the method. Firstly an overview of the potential impact on work-in-process (WIP) and lead time is provided when transfer lot sizes are undifferentiated from processing lot sizes. Simple performance examples are compared to those from a shop with one-piece transfer lots. Next, a mathematical programming model for minimizing lead time in the mixed-model job shop is presented, in which one-piece transfer lots are used. Key factors affecting lead time are found by analyzing the sum of the longest setup time of individual items among the shared processes (SLST) and the longest processing time of individual items among processes (LPT). And lead time can be minimized by cutting down the SLST and LPT. Reduction of the SLST is described as a traveling salesman problem (TSP), and the minimum of the SLST is solved through job shop scheduling. Removing the bottleneck and leveling the production line optimize the LPT. If the number of items produced is small, the routings are relatively short, and items and facilities are changed infrequently, the optimal schedule will remain valid. Finally a brief example serves to illustrate the method.
出处 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2006年第4期487-491,共5页 中国机械工程学报(英文版)
基金 This project is supported by National Natural Science Foundation of China (No.70372062, No.70572044)Program for New Century Excellent Talents in University of China (No.NCET-04-0240).
关键词 Lead time Work-in-process(WIP) Mixed production system Job shop scheduling problem Traveling salesman problem(TSP) Lead time Work-in-process(WIP) Mixed production system Job shop scheduling problem Traveling salesman problem(TSP)
  • 相关文献

参考文献6

二级参考文献16

  • 1朱玉超,刘宏,李在贵.流水作业线负载平衡的时间Petri网模型[J].机械科学与技术,1996,15(5):836-838. 被引量:2
  • 2李建中.混流生产线平衡的动态规划及启发式方法[J].系统工程,1996,14(2):32-35. 被引量:2
  • 3藩家轺.现代生产管理学[M].北京:清华大学出版社,1994..
  • 4何桢,9th International Conference on Computer Aided Production Engineering (CAPE),1993年
  • 5何桢,1991年
  • 6李崇斌,Canada-China International Conference on Management,1990年
  • 7何桢,9th International Conference on Computer Aided Production Enigineering,1993年
  • 8何桢,中国机械工程学会第三次工业工程学术会议论文集,1993年
  • 9何祯,9th International Conference on Computer Aided Production Engineering,1993年
  • 10何桢,硕士学位论文,1991年

共引文献18

同被引文献10

  • 1李葆文.设备管理新思维新模式[M].北京:机械工业出版社.2000.
  • 2Hansen R C. Overall equipment effectiveness [ M ]. New York : Industrial Press, 2002.
  • 3Sass Somekh. Increasing overall equipment effectiveness (OEE) in fab manufacture [J]. Semiconductor Fabtech, 2000(10) :39-43.
  • 4Marie Phelan. TPM-performance measurement techniques o- verall equipment effectiveness (O. E. E. ) [ DB/OL]. [2013-12-17 ]. http: //www. nmc. ie/Web- NMClb/TPM- PMT1. htm.
  • 5He Zhen, Zhang Yu-xuan. Multiresponse surfaces optimiza- tion based on evidential reasoning theory [ J ]. The Asian Journal on Quality, 2010,15 ( 1 ) :68-75.
  • 6Francis Wauters, Jean Mathot. OEE overall equipment effec- tiveness. [ DB/OL]. [ 2014-01-17]. http://www, oee. com.
  • 7He Zhen, Qi Er-shi, Liu Zi-xian. Continuous improvement through integration of quality tools[ J]. The Asian Journal on Quality, 2012,3 ( 2 ) : 104-108.
  • 8Jeroen De Mast. Quality improvement from the viewpoint of statistical method [ J ]. Quality and Reliability Engineering International,2011, 19 (4) : 255- 264.
  • 9李金热,杨新春.设备综合效率OEE计算及扩展[J].中国农机化,2008(3):94-97. 被引量:14
  • 10李葆文.企业OEE计算问题的解决[J].广州大学学报(自然科学版),2002,1(1):91-96. 被引量:18

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部