摘要
针对台山发电厂已投产的4台机组厂用电中公用电的分布情况,给出了3号机组的实际厂用电率的计算公式,并得到了其直接厂用电率,为3号机组煤耗的计算提供了数据。
According to the common power distribution in auxiliary power for four units that have been put into operation in Taishan Power Plant, the formula for calculating the actual auxiliary power consumption (APC) rate of Unit 3 is given, and its direct APC rate is obtained, which provides data for calculating the coal consumption of Unit 3.
出处
《广东电力》
2006年第12期38-40,共3页
Guangdong Electric Power
关键词
机组性能
厂用电率
煤耗
验收试验
performance of unit
auxiliary power consumption (APC) rate
coal consumption~ acceptance test