期刊文献+

故障树分析在计算机联锁系统中的应用 被引量:4

Research and Analysis of Fault Tree in Computer Interlocking System
下载PDF
导出
摘要 应用故障树分析方法对计算机联锁系统进行了可靠性的分析,用故障树讨论了其故障的原因与影响的逻辑关系,并提出了进一步的改进措施及建议. The reliability of the computer interlocking system is analysed by means of the fault tree analysis method. According to the fault tree, the fault reasons and the logic relation of the influence are expounded, then the further improvement measure and suggestion are put forward.
出处 《兰州交通大学学报》 CAS 2006年第6期16-19,共4页 Journal of Lanzhou Jiaotong University
关键词 故障树分析 计算机联锁系统 可靠性 fault tree analysis computer interlocking system reliability
  • 相关文献

参考文献6

二级参考文献10

  • 1李国宁.TWC-6502电气集中微机模拟教学系统[J].兰州铁道学院学报,1996,15(4):48-53. 被引量:1
  • 2铁道科学研究院通信信号研究所.TYJL--TR2000国产容错计算机联锁控制系统研究报告[R].铁道科学研究院,2000..
  • 3铁道科学研究院通信信号研究所.TYJL-TR9容错计算机联锁控制系统研究报告[R].铁道科学研究院,1997..
  • 4铁道科学研究院通信信号研究所.TYJL—II计算机联锁控制系统研究报告[R].铁道科学研究院,1997..
  • 5赵志熙.车站信号自动控制[M].北京:中国铁道出版社,1993..
  • 6赵志熙.车站信号自动控制[M].北京:中国铁道出版社,1993..
  • 7Stian Lydersen, Geir K. Hansen and Helge A. Sandtorv, Safety and reliability, Rotterdam : Balkema, 1998.
  • 8赵志熙,微机联锁系统技术,1995年,198页
  • 9傅佩琛,计算机系统硬件软件可靠性理论及其应用,1990年
  • 10章国栋,系统可靠性与维修性的分析与设计,1990年,36页

共引文献20

同被引文献41

  • 1宋平凡,肖运勇.三取二铁路信号微机联锁系统故障树分析[J].自动化博览,2004,21(3):44-45. 被引量:4
  • 2张佳楠,王海峰,蒋大明.计算机联锁系统二乘二取二容错结构分析[J].铁路计算机应用,2006,15(11):46-49. 被引量:20
  • 3徐安,赵长利,乔向明,刘新芬.车用发动机过热故障树分析[J].汽车技术,2007(3):43-46. 被引量:10
  • 4张志恒,董昱.计算机联锁设备故障诊断专家系统的研究[J].铁路通信信号工程技术,2007,4(4):57-59. 被引量:2
  • 5Takashi Kunifuji,Jun Nishiyama,Hiroyuki Sugahara,et al.A railway signal control system by optical LAN and designsimplification[J] .Journal of etworks,2008(7) :8-15.
  • 6Hamid Hassanabadi,Bijan Moaveni, Mohammad Karimi.Acomprehensive distributed architecture for railway trafficcontrol using multi-agent systems[J] . Proceedings of theInstitution of Mechanical Engineers, 2015,229 ( 2) : 109-1 2 4 .
  • 7Kim MinSeok, Kim MinKyu, Lee JongWoo. Reliability analysisfor train control system by hardware redundancyarchitecture in fault tolerance system [J]. Journal of InternationalCouncil on Electrical Engineering, 2011, 1(2) : 140-144.
  • 8Garcia-Heras M, Agua F, Lopez V, et al.Deterioroy estrategiasde conservacion de elementos metalicos deinteres patrimonial de la estacion de ferrocarril de Aranjuez[J]. Revista de Metalurgia,2011,47(1) :48.
  • 9Andrea D ,Ariano.Improving real-time train dispatchingperformance : optimization models and algorithms for retiming, re - ordering and local re - routing [J]. 40R ,2 0 1 0 ,8 (4 ):429-432.
  • 10Shunsuke kamijo,Toshimitsu Takahashi,Takeshi naito,etal. Framework study on behavior understandings based onposture and location state transition for railway station security[J] . International Journal of Intelligent TransportationSystems Research,2012,10( 3) : 148-155.

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部