贵广Ⅱ回直流输电工程白花洞换流站地基处理方案

Foundation Treatment Scheme of Baihuadong Converter Station in Gui-Guang II Line HVDC Power Transmission Project
下载PDF
导出
摘要 结合贵广Ⅱ回直流工程白花洞换流站地基处理工程设计实际,通过对在地形、地质复杂条件下的换流站的建(构)筑物地基处理设计情况介绍,提出了换流站地基处理设计中的一些控制要点和需要注意的事项。 Based on the actual case of the foundation treatment engineering design of Baihuadong Converter Station in Gui- Guang Ⅱ line HVDC power transmission project, and according to the introduction about how to do foundation treatment design of the buildings when the converter station would be in the area with complex geological condition and undulate landform, some control key points and some things should be considered in the foundation treatment design of the converter station are presented, besides, several modification process and result in design, and some modification explanation are discussed.
作者 张端华
出处 《广东输电与变电技术》 2007年第1期1-4,共4页 Guangdong Power Transmission Technology
关键词 高压直流 换流站 地基处理 HVDC Converter station Foundation treatment
  • 相关文献

参考文献1

  • 1《地基处理手册》(第二版)编写委员会[编],龚晓南.地基处理手册[M]中国建筑工业出版社,2000.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部