摘要
尼尔基水利枢纽二期导流设计标准为5年重现期洪水,流量为534 m3/s。文章介绍截流技术参数和导截流施工方法。
The design criterion of second-stage river diversion in Nierji eater complex is 5 years return period flood, its discharge is 534 m3/s. The paper introduces the technique method of river diversion and the technique parameters of river closure.
出处
《东北水利水电》
2007年第1期34-35,共2页
Water Resources & Hydropower of Northeast China
关键词
导截流
二期导流
尼尔基水利枢纽
river diversion and river closure
second-stage river diversion
Nierji water complex