摘要 新安江大坝已运行40多年。本文结合新安江大坝坝基固结灌浆补强处理,从设计、灌浆试验、灌浆施工等方面阐述了在已建大坝水库运行条件下,利用坝内现有的有限空间进行固结灌浆补强必须充分考虑坝体结构、上游水压力、坝基排水孔、扬压力孔、地质条件等因素,通过灌浆试验,取得合理灌浆参数。该工程的坝基固结灌浆补强处理经验对其它类似大坝补强工程具有一定的参考价值。 Xin'anjiang dam has been in operation more than 40 years.The article expatiated on that foundation consolidation grouting treatment should consider the dam structure, upstream water pressure, drainage hole, uplift hole, geological conditions in the terms of dams in operation, in the limited inner dam space and gain the grouting parameters by testing through introduction of the project foundation consolidation grouting treatment design, grouting testing and construction. The experience of Xin'anjiang dam foundation grouting is of reference value to similar projects.
出处 《大坝与安全》 2006年第6期15-18,共4页 Dam & Safety
关键词 宽缝重力坝 页岩 固结灌浆 廊道 灌浆压力 hollow gravity dam shale solid grouting gallery grouting pressure
  • 相关文献

参考文献2

  • 1水工设计手册6.水利电力出版社,1987.
  • 2何少云.新安江水电站2号-7号坝段坝基固结灌浆工程竣工报告[R],2006.

同被引文献7

引证文献1

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部