基于预报及库容补偿的水库汛限水位动态控制研究 被引量:15

A Dynamic Control Method for Limiting Floodwater Level Based on Flood Forecasting and Reservoir Storage Compensation
下载PDF
导出
摘要 结合清江流域梯级水电站工程特性及防洪任务,以不降低梯级防洪标准为原则,建立基于预报及上游水布垭水库库容补偿的汛限水位动态控制模型,推求隔河岩水库汛期汛限水位动态控制方案。计算表明,该模型在不降低水库及梯级原有的防洪标准前提下,能有效利用上游水布垭水库的防洪库容,分担隔河岩水库部分防洪任务,并显著提高其发电量。其中,多年平均弃水量减少4.1444亿m^3,发电量增加1.2172亿kW·h。 According to the characteristics of the cascade reservoirs in the Qingjiang River Basin and flood control duty, a dynamic control method for limiting floodwater level was developed based on real-time forecasting information and upstream reservoir storage compensation information. By effectively using the flood control storage in the upstream reservoirs and sharing the flood control pressure in downstream reservoirs, this method can make reasonable and timely decisions to enhance the floodwater resources benefit remarkably without lowering the design flood prevention standard. The application results of the Geheyan Reservoir showed that it could decrease the abandoned floodwater by 414.44 million m^3 and generate about 121.72 million kWh hydmpower annually.
出处 《水文》 CSCD 北大核心 2006年第6期11-16,共6页 Journal of China Hydrology
基金 水利部重大科研项目<水库设计运用专题研究>
关键词 库容补偿 汛限水位 动态控制 洪水预报 reservoir storage compensation limiting floodwater level dynamic control flood forecasting
  • 相关文献

参考文献5

二级参考文献36

共引文献234

同被引文献134

引证文献15

二级引证文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部