期刊文献+

基于神经网络的Job-Shop类调度问题 被引量:3

A Job-Shop scheduling solution based on neural network
下载PDF
导出
摘要 提出了将Hopfield神经网络与模拟退火相结合以求解Job-Shop类调度问题的算法。该算法给出了Job-Shop类调度问题的约束条件,并且直接把问题的各种约束条件表示为Hopfield神经网络的能量函数项。为避免Hopfield神经网络容易收敛到局部极小解而产生非法调度解的缺点,将模拟退火算法应用于Hopfield神经网络求解,使Hopfield神经网络收敛到能量函数的全局最优解,从而保证神经网络输出是一个可行的调度方案。通过仿真实例验证了该算法的可行性。 Based on Hopfield neural network and simulated annealing, an algorithm for the Job-Shop scheduling problem was proposed. This algorithm put forward the constraint of the Job-Shop scheduling, then formulates the energy function of Hopfield neural network according to constraints directly. Lest the network converged into the local minimum of the function the simulated annealing was applied. Thus the global minimum of the Job-Shop scheduling problem as a feasible scheme appears. The results of simulation calculation show that this algorithm is efficient.
出处 《机电工程》 CAS 2007年第1期63-65,70,共4页 Journal of Mechanical & Electrical Engineering
基金 教育部科学技术研究重点项目(205066) 浙江省自然科学基金资助项目(M703100)
关键词 Job—Shop类调度 HOPFIELD神经网络 模拟退火 Job-Shop scheduling Hopfield neural network simulated annealing
  • 相关文献

参考文献7

  • 1GAREY M,JOHNSON D.SETHY R.The complexity of flow shop and job shop scheduling[J].Mathematics of Operations Research,1976,1 (2):117-129.
  • 2EUGENIUSZ N,CZES L S.An advanced tabu search algorithm for the Job Shop problem[J].Journal of Scheduling,2005,8(2):145-159.
  • 3HUANG W Q,YIN A H.An improved shifting bottleneck procedure for the job-shop scheduling problem[J].Computers & Operations Research,2004,31 (12):2093-2110.
  • 4LIU T K,TSAI J T,CHOU J H.Improved genetic algorithm for the job-shop scheduling problem[J].The International Journal of Advanced Manufacturing Technology,2006,27 (9):1021-1029.
  • 5沈刚,汪叔淳.用神经网络求解Job-Shop类型调度问题[J].电子学报,1995,23(8):48-51. 被引量:13
  • 6SIMON H.NEURAL NETWORKS A Comprehensive Foundation Second Edition[M].北京:清华大学出版社,2004.
  • 7靳利霞,唐焕文,李斌,计明军,朱训芝.一类连续函数模拟退火算法及其收敛性分析[J].计算数学,2005,27(1):19-30. 被引量:17

二级参考文献19

  • 1杨若黎,顾基发.一种高效的模拟退火全局优化算法[J].系统工程理论与实践,1997,17(5):29-35. 被引量:101
  • 2S Kirkpatrick, J C D Gelat, M P Vecchi. Optimization by simulated anncaling, Science,220(1983), 671-680.
  • 3M M Ali, A Torn, S Viitanen, A direct search variant of the simulated algorithm for optimization involving continuous variables, Computers & Operation Research, 29(2002),87 102.
  • 4R L Yang, Convergence of the simulated annealing algorithm for continuous global optimization, Journal of Optimization Theory and Applications, 104(2000), 691 716.
  • 5M Locatelli, Simulated annealing algorithms for continuous global optimization: convergence conditions, Journal of Optimization Theory and Applications, 104(2000), 121-133.
  • 6R H Leary, Global optima of Lennard-Jones clusters, Journal of Global Optimization,11(1997), 35 53.
  • 7T Trafalis, S Kasap, A novel metaheuristics approach for continuous global optimization,Journal of Global Optimization, 23(2002), 171- 190.
  • 8R Chelouch, P Siarry, Tabu search applied to global optimization, Computers & Operation Reseach, 123(2000), 256-270.
  • 9K F C YIU, Y LIU, K L TEO, A hybrid descent method for global optimization, Journal of Global Optimization, 28(2004), 229-238.
  • 10Mingjun Ji, Huanwen Tang, Application of chaos in simulated annealing, Chaos, Solitons & Fractals, 21(2004), 933-941.

共引文献28

同被引文献35

  • 1袁云峰,欧阳令南.上市公司财务失败预测[J].经济理论与经济管理,2004,24(9):33-38. 被引量:5
  • 2陶松桥,杨明忠.基于ERP与MES集成的车间生产计划和调度方法[J].机电工程技术,2005,34(6):64-65. 被引量:14
  • 3Chin Soon Chong, Appa lyer Sivakumar, Robert Gay. Simulation-based scheduling for dynamic discrete manufacturing [A] . Proceedings of the 2003 Winter Simulation Conference (IEEE Cat. No.03CH7499) [C], 2003, 2: 1465-1473.
  • 4Miao, X Kleinman, D.L. Dynamic job scheduling with strict deadline [A] . Proceedings of the 29th IEEE Conference on Decision and Control (Cat. No.90CH2917-3) [C], 1990, 1: 116-121.
  • 5Chand, Suresh, Trauh, et al. Single-machine scheduling with dynamic arrivals: decomposition resuhs and an improved algorithm [J] . Naval Research Logistics, v43, n5, Aug, 1996: 709-719.
  • 6J.R.Jackson. Scheduling a Production Line to Minimize Maximum Tardiness, Research Report 43, Management Science Research Projects [R] . LosAngeles, USA: University of California, 1955.
  • 7W.E.Smith. Various optimizers for single stage production [J] . Naval Research Logistics Quarterly, 1956, 3: 59-66.
  • 8B.Giffler, G,L.Thompson. Algorithms for solving production scheduling problems [J] . Operations Research, 1960: 487- 503.
  • 9S.S.Panwalker, W.Iskander. A Survey of Scheduling Rules [J] . Operations Research, 1977, 25: 45-61.
  • 10] Fox M S, Smith S F.ISIS: A knowledge-based system for factory scheduling [J] . Expert Systems, v 1, n 1, July 1984: 25-49.

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部