围绕六安发电厂钢筋混凝土烟囱筒体电动升模施工的过程,介绍了烟囱筒体电动升模施工体系的组成和工作原理,阐述了施工过程中安全技术措施策划和控制管理的要点,为类似高耸构筑物施工中的安全管理提供经验和依据。
Based on the reinforced concrete chimney body construction project of Lu' an Power Plant, this paper mainly introduced constitutes and work theory of electric climbing-form system in the construction of chimney body, Also, it analyzed the safety technology scheme and the key points of management control in the construction process, which provided experiences and foundations in safety management for further high-building constructions.
出处
《安徽建筑工业学院学报(自然科学版)》
2006年第6期31-35,共5页
Journal of Anhui Institute of Architecture(Natural Science)
关键词
烟囱
升模施工
安全技术
策划及管理
chimney
climbing-form construction
safety technology
mastmaind and management