大跨径预应力混凝土箱梁桥长期下挠问题的研究现状 被引量:143

State of Art of Long-term Deflection for Long Span Prestressed Concrete Box-girder Bridge
下载PDF
导出
摘要 近年来,大跨径预应力混凝土箱梁桥的下挠现象日益威胁结构安全,而导致这一现象的原因仍然没有完全明确。从混凝土的收缩徐变、预应力效应、箱梁开裂的影响、现有计算与防治手段等方面,对国内外在大跨径预应力混凝土箱梁桥下挠问题上的研究现状进行了总结与综合评价分析;对导致下挠问题的主要成因与研究难点在机理上进行了解释。最后,对桥梁设计计算、桥梁混凝土施工及箱梁下挠的防治技术进行论述,并对开展控制结构长期下挠的研究提出了建议。 The long-term deflection of Long Span Prestressed Concrete Box-girder Bridge (LSPCBB) is getting more and more serious in terms of structure safety. And there are still many ambiguous reasons as to the cause of the deflection of LSPCBB. In respect of the causes of long-term deflection, domestic and aboard research literatures on the deflection problem of KSPCBB are reviewed and analyzed from the aspects of concrete creep & shrinkage, prestress effect, box-girder cracking, calculation and retrofit methods.Not only are the cause mechanism and research difficulties of the deflection explained, but also the suggestions about further research of long-term deflection control in design calculation, construcfion and retrofit technologies of KSPCCB are presented.
出处 《公路交通科技》 CAS CSCD 北大核心 2007年第1期47-50,共4页 Journal of Highway and Transportation Research and Development
基金 交通部西部交通建设科技资助项目(200631822327) (200331822315)
关键词 大跨径 箱梁桥 预应力混凝土 长期下挠 long span box-girder bridge prestressed concrete long-term deflection
  • 相关文献

参考文献13

  • 1SANTIAGO RODRIGUEZ. Design of long span concrete box gh-der bridges challenges and solutions [ C ] //Proceedings the 2004 Structures Congress-Building on the Past: Securing the Future.Nashville TN USA:ASCE, 2004: 361-371.
  • 2PEFER F TAKACS. Deformations in Concrete Canfilever Bridges: Observations and Theoretical Modefing [D] .Norway: The Norwegian University of Science and Technology, 2002.
  • 3RAFAEL MANZANAREZ, MIROSLAV OLMER.Parrotts Ferry Bridge Retrofit [R] .T.Y.I,in. lntemational, 1994.
  • 4杨志平,朱桂新,李卫.预应力混凝土连续刚构桥挠度长期观测[J].公路,2004,49(8):285-289. 被引量:51
  • 5BRUNO MASSICOITE, ANDRE PICARD.Monitoring of a prestressed segmental box girder brideg during strengthening [J].PCI Joumal,1994, 39 (3): 66-80.
  • 6PILZ M. The Koror-Babeklaob bridge in the republic of Palau, historyand time dependent stress and deflection analysis [D] .UK: ImperialCollege of Science and Technology, 1997.
  • 7PIOTR GWOZDZIEWICZ, et al.Long term serviceability of concrete structures with regants to material behaviors and cyclic loading [ C ] // Proceedings the 2000 Structures Congress-Advanced Technology in Structural Engineering.Philadellxhia Pennsylvania USA: ASCE, 2000: 1-8.
  • 8MICHAL STEVULA, et al.Some details of long-term analysis of concrete bridges [C] //2nd International Ph.D.Symposium in Civil Engineering.Budapest Hungary 1998: 26-28.
  • 9ZDENEK P BAZANT, JOONG-KOO KIM. Improved prediction model fortime-dependent deformations of concrete: part 5-cyclic load and cyclichumidity [J] .Materials and Structures, 1992, 25 (147): 163 -169.
  • 10IAN N ROBERTSON.Prediction of vertical deflections for a long-span prestressed concrete bridge structure [ J ] .Engineering Structures, 2005, 27 (12): 1 820-1 827.

二级参考文献4

共引文献58

同被引文献863

引证文献143

二级引证文献923

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部